Tel: (440) 951-9667     Fax: (440) 951-9077

 05/14/10
PPS Asia Pacific will see you at the SF China being held at the Guangzhou International Convention & Exhibition Center from September 27-29, 2010.

 06/16/08

We look forward to seeing you at the SUR/FIN 2008 trade show on June 16-18th. Come see us in booth 923. We are ready to answer your questions and discuss your finishing needs.



 06/06/07

Look for the Plating Process Systems booth in November at the show.  On display will be many examples of our products.  Stop by our booth and one of our experienced represenatives will be glad to speak with you.

The show will be held November 21-23, 2007 at the Shanghai New International Expo Center (SNIEC)

Hall E1, Zone 2

Booth 1F21-25





Nickel Troubleshooting

NICKEL TROUBLESHOOTING is divided into five categories as shown by the links below. Select the desired process

•   Electroless Nickel
•   Bright Nickel w/ Index
•   Semibright Nickel
•   Duplex Nickel
•   Bright Nickel Without Index
•   *Carbon Treatment*
•   *High pH Treatment*
•   *Carbon+High pH Treatment*
A Combination Carbon and High pH Treatmentis best performed separately since a great deal of sludge may strain the sludge capacity of the filter. As such, it is usually preferred to first high pH treat the solution followed by pH adjustment and carbon treatment.

If both treatments must be made simultaneously, follow steps 1 through 5 under Carbon Treatment followed by steps 2 through 12 under High pH Treatment.

•   *"Dummy" Treatment*

•   *Calcium Removal Treatment*



Powered by Evolhost Web Hosting